Stands out for fiber and telecom

Land, title and right‑of‑way services in Storey County, Nevada.

98 active federal leases and rights-of-way, including 28 for power and transmission and 27 for roads. We take on title, leasing and right-of-way work on both sides of the federal line: this record, and the private ground it runs through.

98Active federal leases and rights‑of‑way
23Fiber and telecom grants
28Power and transmission grants
1Wind energy grants
644Open mining claims

From the county profile, computed October 8, 2026. Federal cases only: private and state land are not in this record, and a case that crosses a county line counts in each county it touches.

Check a section here

Click your ground in Storey County.

The free Site check, opened on this county: who manages the land, how many private owners hold it and how much of it the largest hold, from the public record in seconds.

This is Storey County. Click your ground.

Type an address, or find your site on the map and click it. The section outline appears before anything is checked.

I know the legal description

Who is active here

The companies holding federal leases and rights‑of‑way in Storey County.

  1. Sierra Pacific Power Co24 grants
  2. Nevada Power Company (Nevada Energy)2 grants
  3. Great Basin Gas Transmission Company2 grants
  4. Southwest Gas Corp2 grants
  5. State of Nevada2 grants
  6. Marlette Lake Company2 grants
  7. Refuse Inc.2 grants
  8. Comstock Wind, LLC1 grant
  9. 4 holders that may be private persons, not named

From BLM's public record, by holder. Company and agency names as BLM records them; a holder who is a private person is counted, never named.

The federal record, industry by industry

What sits on federal ground in Storey County.

IndustryAuthorizedPendingNew in 12 months
SolarSolar energy grantsNoneNoneNone
WindWind energy grants11None
GeothermalGeothermal leases111
Oil and gasOil and gas leases and grantsNoneNoneNone
Transmission and powerPower and transmission grants28NoneNone
PipelinesPipeline grants61None
Telecom and fiberFiber and telecom grants231None
WaterWater grants83None
RoadsRoad grants272None
MiningOpen mining claims644NoneNone
OtherOther federal cases41None

“Not covered yet” means the record has not been read for that industry here; “None” means it was read and holds none.

What else the record holds here

Beyond federal land: queues, plants, permits and the ground itself.

  • Public landPartly covered

    Federal surface management from BLM; state trust, state and local public land (PAD-US) are not loaded yet.

    Bureau of Land Management, Surface Management Agency, October 7, 2026

  • Federal leases and rights-of-wayCovered

    BLM leases and rights-of-way, by industry.

    Bureau of Land Management, MLRS, October 7, 2026

  • Oil and gas activityPartly covered

    Federal oil and gas leases and facility rights-of-way; state well permits are not loaded yet.

    Bureau of Land Management, MLRS, October 7, 2026

  • Solar and windPartly covered

    Solar and wind rights-of-way on federal land; power plants and interconnection queues are not loaded yet.

    Bureau of Land Management, MLRS, October 7, 2026

  • Transmission and gridPartly covered

    Power line and pipeline rights-of-way on federal land; transmission lines, substations and plants are not loaded yet.

    Bureau of Land Management, MLRS, October 7, 2026

  • Interconnection queuesCovered

    Active interconnection requests and their capacity, by technology.

    Lawrence Berkeley National Laboratory and GridTracker, Queued Up (CC BY 4.0), October 7, 2026

  • Power plantsCovered

    Operating and planned generators of 1 MW or more, their capacity by technology, and reported retirements.

    Source: U.S. Energy Information Administration, Form EIA-860M (August 2026), October 7, 2026

  • Data centers and powerPartly covered

    The utility serving the county, with average retail prices (Average retail price by utility (EIA-861/861M), not a tariff quote; the rate a site gets depends on its tariff and load); the state's data center sales and use tax exemption from its statutes (summary, not legal advice; check the statute); hosting establishments are not loaded yet; substation capacity is not public.

    Source: U.S. Energy Information Administration, Form EIA-861 and EIA-861M, 2025 annual; monthly through 2026-07 · State statutes on data center incentives, read on official pages and curated by Impact Land Services (summary, not legal advice), October 6, 2026

  • ConstraintsPartly covered

    Superfund sites and brownfields and critical habitat (none designated here); flood zones, wetlands and protected areas are not loaded yet.

    U.S. Environmental Protection Agency, Facility Registry Service, October 7, 2026 · U.S. Fish and Wildlife Service, Critical Habitat, October 7, 2026

  • WaterCovered

    Drought conditions this week and over the last year (U.S. Drought Monitor); water rights in force and pending, from the state engineer; groundwater levels and aquifer tests, from the state engineer; community water system service areas (EPA; some boundaries modeled).

    The U.S. Drought Monitor is jointly produced by the National Drought Mitigation Center at the University of Nebraska-Lincoln, the United States Department of Agriculture, the National Oceanic and Atmospheric Administration and the National Aeronautics and Space Administration. Map courtesy of NDMC., October 7, 2026 · Nevada Division of Water Resources, October 7, 2026 · Nevada Division of Water Resources, October 7, 2026 · U.S. EPA, Community Water System Service Area Boundaries (MIT License, Copyright (c) 2025 US EPA), October 7, 2026

Not covered yet here: Parcels and owners, Building permits.

What this page cannot tell you

The private half of Storey County is not in any database.

Everything above is what the federal government controls. It does not show who owns a severed mineral or geothermal estate on private ground, whether that title is clean, what liens sit against it, or which families you will be negotiating with. That lives in the Storey County recorder's office, and it is the step that decides whether you can actually lease the ground.

How we work here
  • FeasibilityOwnership, constraints and the federal record for your area, read before you commit.
  • Land and titleCounty title, tract by tract, with surface, mineral and geothermal estates run separately. Then the leases and agreements.
  • Rights of way and field servicesCorridors, survey, permitting and site work, delivered by one Impact project team.
Source: Impact's county profile, from the Bureau of Land Management's Mineral & Land Records System and the sources named above; county boundary from the U.S. Census Bureau. Computed October 8, 2026. Informational only; not a title opinion or legal advice.