The land side of geothermal, solar, wind, storage and transmission projects, run by one team from the first look at a site through decades of operation.
Most energy developments stall on the ground long before they stall on engineering. We take that part off your team: the records, the owners, the corridors, the approvals and the field work, run on one schedule toward the day the project delivers power.

Federal geothermal leases, private ground and severed geothermal estates, reconciled into one position. We find the estates a surface-only review misses.

Large contiguous tracts with clean title, clear of constraints and close to interconnection, assembled owner by owner.

Many owners, long leases and setbacks across ridgelines and range, negotiated once and kept current for decades.

Smaller sites on tight timelines next to existing substations. Title, survey and approvals run fast and in parallel.

Corridors across hundreds of owners and federal land, stationed, surveyed and secured parcel by parcel.
Federal lease and claim records, ownership by estate, constraints and distance to interconnection, read before you file or option.
Leases, options and surface use agreements, with title run at the county by estate: surface, mineral and geothermal.
Gen-tie and access routes across private and federal ground, including federal right-of-way applications.
Federal environmental review, county conditional use permits and state approvals, run on the same schedule as the land.
ALTA surveys for financing, boundary and route survey, corner recovery and site walks.
Interconnection milestones, water, road access and fiber coordinated, so construction is never waiting on the site.
Rentals, renewals and obligations kept current, and every payment checked against the title behind it.
The client is confidential. Figures as published in the case study.
Found, contacted and negotiated with, through fractional interests and holdouts.
Assembled one at a time, with 109 leases executed.
Ground where the surface owner does not own what lies beneath. A surface-only review misses every one.
Stood up across the West, each with its own records, agencies and local practice.
Acreage measured off the master title plat, not the county tax roll, parcel by parcel.
Surface, mineral and other estates researched separately, with every defect named and cured.
Every obligation on one calendar a year ahead, and no payment released on unclear title.
Different industries, the same hard part: a lot of land, a lot of owners and a schedule that cannot slip.

Large sites with power, water and fiber, confirmed before you commit, then assembled and entitled.
Data centers
Assemblage, title, survey and entitlement for industrial, master planned and mixed use projects.
Real estate
Transmission, pipelines, water and fiber. Corridors and rights of way across hundreds of owners.
Infrastructure
Tell us where it is, what it needs and when. We will come back with who would work on it and what we would do first.