
The land side of hyperscale and colocation campuses: sites that can carry the power, water and fiber, assembled, entitled and kept in order.
We confirm what a site can carry before you commit, assemble it across every owner, run the approvals and coordinate the utilities, so the land is never the reason a campus slips.

Hundreds of contiguous acres assembled across many owners, with power and water confirmed before the first option is signed.

Sites close to fiber and load, where title, zoning and access have to be clean and fast.

Ground positioned near transmission and substations, secured with the rights a buyer will ask about.

The corridors and sites that bring power to the campus, secured owner by owner.
Site size, ownership, zoning, constraints, and what power, water and fiber the ground can reach, read before you commit.
Assemblage across every owner, with options, purchases and title run parcel by parcel.
Gen-tie, water, fiber and access corridors secured to the site.
Zoning, county approvals and the state and federal reviews the campus triggers, run on one schedule.
ALTA surveys for financing, boundary survey and site walks.
Utility capacity, water supply and fiber routes coordinated alongside the land.
Obligations, renewals and easements kept current as the campus grows in phases.
Our record so far is in energy. The work carries over: many owners, hard title and a schedule that cannot slip. Figures from one utility-scale geothermal position, as published in the case study.
Found, contacted and negotiated with, through fractional interests and holdouts.
Assembled one at a time, with 109 leases executed.
Ground where the surface owner does not own what lies beneath. A surface-only review misses every one.
Stood up across the West, each with its own records, agencies and local practice.
Acreage measured off the master title plat, not the county tax roll, parcel by parcel.
Surface, mineral and other estates researched separately, with every defect named and cured.
Every obligation on one calendar a year ahead, and no payment released on unclear title.
Different industries, the same hard part: a lot of land, a lot of owners and a schedule that cannot slip.

Geothermal, solar, wind, storage and transmission. Fragmented ownership and severed estates are ordinary work for us.
Energy
Assemblage, title, survey and entitlement for industrial, master planned and mixed use projects.
Real estate
Transmission, pipelines, water and fiber. Corridors and rights of way across hundreds of owners.
Infrastructure
Tell us where it is, what it needs and when. We will come back with who would work on it and what we would do first.
Start a project