Stands out for pipelines

Land, title and right‑of‑way services in Grand County, Utah.

1,040 active federal leases and rights-of-way, including 358 for oil and gas and 260 for roads. 4,539 open mining claims compete for the surface. We take on title, leasing and right-of-way work on both sides of the federal line: this record, and the private ground it runs through.

1,040Active federal leases and rights‑of‑way
248Pipeline grants
358Oil and gas leases and grants
48Fiber and telecom grants
4,539Open mining claims

From the county profile, computed October 8, 2026. Federal cases only: private and state land are not in this record, and a case that crosses a county line counts in each county it touches.

Check a section here

Click your ground in Grand County.

The free Site check, opened on this county: who manages the land, how many private owners hold it and how much of it the largest hold, from the public record in seconds.

This is Grand County. Click your ground.

Type an address, or find your site on the map and click it. The section outline appears before anything is checked.

I know the legal description

Who is active here

The companies holding federal leases and rights‑of‑way in Grand County.

  1. Ugc Midstream LTD LLC103 grants
  2. Running Foxes Petroleum Inc.71 grants
  3. Pacificorp DBA Rocky MTN PWR19 grants
  4. Arb Energy Utah, LLC19 grants
  5. Pacificorp DBA Upl13 grants
  6. Northwest Pipeline GP10 grants
  7. Frontier Communications8 grants
  8. Pacificorp7 grants
  9. 2 holders that may be private persons, not named

From BLM's public record, by holder. Company and agency names as BLM records them; a holder who is a private person is counted, never named.

The federal record, industry by industry

What sits on federal ground in Grand County.

IndustryAuthorizedPendingNew in 12 months
SolarSolar energy grantsNone1None
WindWind energy grantsNoneNoneNone
GeothermalGeothermal leasesNoneNoneNone
Oil and gasOil and gas leases and grants358None25
Transmission and powerPower and transmission grants472None
PipelinesPipeline grants2483None
Telecom and fiberFiber and telecom grants482None
WaterWater grants461None
RoadsRoad grants26093
MiningOpen mining claims4,539NoneNone
OtherOther federal cases33NoneNone

“Not covered yet” means the record has not been read for that industry here; “None” means it was read and holds none.

What else the record holds here

Beyond federal land: queues, plants, permits and the ground itself.

  • Public landPartly covered

    Federal surface management from BLM; state trust, state and local public land (PAD-US) are not loaded yet.

    Bureau of Land Management, Surface Management Agency, October 7, 2026

  • Federal leases and rights-of-wayCovered

    BLM leases and rights-of-way, by industry.

    Bureau of Land Management, MLRS, October 7, 2026

  • Oil and gas activityPartly covered

    Federal oil and gas leases and facility rights-of-way; state well permits are not loaded yet.

    Bureau of Land Management, MLRS, October 7, 2026

  • Solar and windPartly covered

    Solar and wind rights-of-way on federal land; power plants and interconnection queues are not loaded yet.

    Bureau of Land Management, MLRS, October 7, 2026

  • Transmission and gridPartly covered

    Power line and pipeline rights-of-way on federal land; transmission lines, substations and plants are not loaded yet.

    Bureau of Land Management, MLRS, October 7, 2026

  • Interconnection queuesCovered

    No active interconnection request is located in this county.

    Lawrence Berkeley National Laboratory and GridTracker, Queued Up (CC BY 4.0), October 7, 2026

  • Power plantsCovered

    No generator of 1 MW or more is reported in this county.

    Source: U.S. Energy Information Administration, Form EIA-860M (August 2026), October 7, 2026

  • Data centers and powerPartly covered

    The utility serving the county, with average retail prices (Average retail price by utility (EIA-861/861M), not a tariff quote; the rate a site gets depends on its tariff and load); the state's data center incentives are not yet reviewed; hosting establishments are not loaded yet; substation capacity is not public.

    Source: U.S. Energy Information Administration, Form EIA-861 and EIA-861M, 2025 annual; monthly through 2026-07

  • ConstraintsPartly covered

    Superfund sites and brownfields and critical habitat, final and proposed, and its species; flood zones, wetlands and protected areas are not loaded yet.

    U.S. Environmental Protection Agency, Facility Registry Service, October 7, 2026 · U.S. Fish and Wildlife Service, Critical Habitat, October 7, 2026

  • WaterPartly covered

    Drought conditions this week and over the last year (U.S. Drought Monitor); community water system service areas (EPA; some boundaries modeled); groundwater is not loaded yet. Utah water rights are held: the Division of Water Rights states no license for its data.

    The U.S. Drought Monitor is jointly produced by the National Drought Mitigation Center at the University of Nebraska-Lincoln, the United States Department of Agriculture, the National Oceanic and Atmospheric Administration and the National Aeronautics and Space Administration. Map courtesy of NDMC., October 7, 2026 · U.S. EPA, Community Water System Service Area Boundaries (MIT License, Copyright (c) 2025 US EPA), October 7, 2026

Not covered yet here: Parcels and owners, Building permits.

What this page cannot tell you

The private half of Grand County is not in any database.

Everything above is what the federal government controls. It does not show who owns a severed mineral or geothermal estate on private ground, whether that title is clean, what liens sit against it, or which families you will be negotiating with. That lives in the Grand County recorder's office, and it is the step that decides whether you can actually lease the ground.

How we work here
  • FeasibilityOwnership, constraints and the federal record for your area, read before you commit.
  • Land and titleCounty title, tract by tract, with surface, mineral and geothermal estates run separately. Then the leases and agreements.
  • Rights of way and field servicesCorridors, survey, permitting and site work, delivered by one Impact project team.
Source: Impact's county profile, from the Bureau of Land Management's Mineral & Land Records System and the sources named above; county boundary from the U.S. Census Bureau. Computed October 8, 2026. Informational only; not a title opinion or legal advice.